St Nicholas, School Extension, South London


Contract Value: £1.5m

Contract duration: 30 weeks

AKDP Appointment: Architectural Design Consultants



Info/description

Working with a Partnering Contractor and the Local Authority, AK Design developed this scheme through Building Control and the construction phases on a very difficult terrain.


The new build included 4 classrooms and toilet facilities for disabled pupils as part of 'Schools for the Future' initiative.


AK Design prepared all general arrangement setting out and working drawings, including temporary crane bases, foundations, retaining walls, columns, concrete floors and superstructure together with a Greenroof construction and cedar cladding.